Perfil de la empresaCompany profile Aitesa is a spanish company with more than 25 years of experience in Engineering Industry with forefront solutions...
HistoriaOur history Founded in 1985, in AITESA we believe that courage and pioneering spirit are the key to innovation ,keeping faithful to our principles...
Certificados de calidadQuality certificates In AITESA we understand that achieving the highest quality standards is part of any organization that wants to improve its way of working...
Petroquímica y químicaPetrochemical and chemical High quality standards and technical requirements...
InstalacionesFacilities To generate electricity and thermal energy reduces costs...
ServiciosOur services We can provide both management and technical services...
EnergíaEnergy Our services Include from Basic Engineering till implementation of complex facilities...
Suministros industrialesIndustrial supply We work with the most relevant companies worldwide...
ProductosProducts Products aimed to do thermal energy recovery...
News

The recovery boiler at the Papel Aralar Cogeneration Plant is already operating

22/09/2011
In May Aitesa commissioned the recovery boiler on a 15 MW Siemens gas turbine in the Aralar paper factory located in Guipuzcoa. This turnkey project is part of a new cogeneration plant in combined cycle of 14 MWe.

The recovery boiler at the Papel Aralar Cogeneration Plant is already operating
Aitesa provided a boiler of 2 bodies, with integrated bypass and with a 2MW post-combustion natural gas burner. The first body of natural circulation system and indirect monitoring generates high pressure steam of and the second body of forced circulation system produces low pressure steam. The boiler is designed to produce up to 22.8 t/h of superheated steam at 400°C and 2.2 t/h of saturated steam at 7 bar. This turnkey installation includes all auxiliaries: power pumps HP and LP, deaerator, continuous purge tank, purge cooling tank, steam silencer, field instrumentation, control and power panels.

The project implementation, including assembly and commissioning was carried out within 14 months, adjusting to the initial planning. With this project Aitesa proves once again its ability to provide turnkey boilers for cogeneration plants with industrial gas turbines up to 60 MW.
Valid XHTML 1.0 Transitional ¡CSS Válido! Legal Terms     Created by CHC / SAO Comunicación Follow Us: