Cepsa has awarded Aitesa the modifications to be made in the combustion air preheating system to increase the efficiency of the fired heater in the Platforming Unit.
This project consists of 2 stages:
The aim of the first stage of the project is to develop Basic Engineering and FEED (Front End Engineering and Design) in order to improve the efficiency of heat recovery system and energy savings.
The second stage consists of the supply and installation of the improvements in the air preheating of the fired heater and modifications in the burners and blowers of air and gas.
The aim is to take advantage of the thermal level available in the outlet of flue gas of the PP-H-1/2/6 fired heaters to preheat the combustion air of the PP-H-3/4/5 fired heaters and optimizing the heat recovery.