Aitesa wins a contract for performing basic engineering and detailed engineering services for waste heat recovery boiler for ZUG ENERGY Combined Cycle Plant in Jakarta, Indonesia.
The engineering package will include all the necessary information, such as drawings, mechanical and thermal design, P&IDs and wiring diagrams, calculate the necessary resistance for high pressure steam lines, control and instrumentation, etc. required by ZUG ENERGY to manufacture and the integrate the waste heat recovery boiler into the plant process.