Design, supply and assembly of the modifications to be made in the air preheating system of the Hydrocraker fired heater of I.C. Cartagena.
During the technical stop at the Cartagena refinery, Repsol will introduce the latest technologies and increase the efficiency of the processes.
Aitesa will develop one of the projects assigned by the client, the intention being to modify the existing model of the air preheater of the hydrocracker heater in order to improve the energetic efficiency by expanding the exchange surface. This air preheater will work with Fuel Gas flue gases.
All the necessary engineering works will be carried out for the complete development of the project in a safe way and complying with the deadlines of the refinery stop.